Under
what conditions must NYC Advisory Board drawings be filed?
A
new installation of new equipment totaling 1000KVA or greater.
Exceptions
Exception
No. 1:
No submittal is required soley for fire alarm
service taps.
Exception
No. 2:
No
submittal is required for the addition of one 2nd
level overcurrent protection device 200A or less.
Any
change in an installation with a rating of 1000KVA or larger,
up to an including the 2nd level of overcurrent protection unless
it was fully described and approved as "future" on
the original approved plan.
Any
addition to an installation, which would bring the total to
1000KVA or larger.
The
addition of any equipment in a room, which would affect clearances
around the equipment of a 1000KVA installation.
A
new installation or revised installation above 600V irrespective
of KVA rating.